Wood, waste and metal rem
Veröffentlicht
vor 1805 Tagen
Pile of Wood from a small roof plus 3 buckets of build waste.
+ three normal garage bags of waste (not heavy)
A 50x50 piece of concerts part of Wall.
And a bucket of various metal and small metal/ aluminium waste
Important all is taken to ÅVC
No elevator, 3 stairs in a old building with sensitive walls, care is of essence